Safety Flash
Thermal tunnel buoyancy when deployed subsea
Read at IMCAOpens the publisher’s page on imca-int.com
Summary
A thermal tunnel failed to sink during subsea construction because the manufacturer’s buoyancy calculations were incorrect. Additional weight enabled installation beneath a concrete mattress. The flash discusses wet testing, independent buoyancy verification and management of change, while identifying a potential recurrence if the mattress were removed and weight fixings had deteriorated.