Investigation Report

2023-001 GC40 BSEE Panel Investigation Final Report GC40

BSEEBureau of Safety and Environmental Enforcement2023-001

2023-001 GC40 BSEE Panel Investigation Final Report GC40

Read at BSEEOpens the document on bsee.gov

Summary

BSEE investigates a subsea flowline jumper failure involving hydrogen embrittlement of four flange studs and an estimated 479-barrel oil release. Metallurgical testing and finite element analysis examine material suitability and loading. Findings address procurement omissions, quality assurance, management of change and leak-detection limitations, with recommendations for operators to consider.

Topics

About This Record
Publisher
Bureau of Safety and Environmental Enforcement
Type
Investigation Report
Reference
2023-001
Date
Unknown
Topic
Hydrocarbon Release, Mechanical Failure, Structural and Asset Integrity
Activity
Inspection and Maintenance, ROV Operations
Equipment
Process Pipework and Pipelines
Control
Alarm Management, Independent Audit and Verification, Management of Change, Stop-Work Authority
Sector
Upstream Oil and Gas
Setting
Subsea
Link
Checked , working
Record
bsee-2023-001 · added 2 October 2026

Report a problem with this record