Investigation Report
Shallow Water Flow from Wellhead Cement Port During Riserless Drilling
Read at BSEEOpens the document on bsee.gov
Summary
BSEE investigates shallow water flow from a wellhead cement port during riserless drilling at Garden Banks Block 962. Fluid analysis detected limited hydrocarbons. Logging and ROV monitoring examined cement channelling; investigators identified salt contamination as the probable cause. Shell subsequently decided to temporarily abandon the well.