Investigation Report

Synthetic-Base Mud Released Overboard After BOP Test

BSEEBureau of Safety and Environmental Enforcement

11-08-2005 16:00 G07995 GC/158 Pollution

Read at BSEEOpens the document on bsee.gov

Summary

The investigation describes a release of 15 barrels of synthetic-base mud after a BOP test on the Green Canyon 158 A-7 well. A butterfly valve was only partly closed, diverting excess mud overboard. The report identifies unfamiliarity with the role and rig, and inadequate communication between the driller and shaker hand.

Topics

About This Record
Original title
11-08-2005 16:00 G07995 GC/158 Pollution
Publisher
Bureau of Safety and Environmental Enforcement
Type
Investigation Report
Date
Unknown
Topic
Environmental Protection, Human Factors, Hydrocarbon Release
Activity
Drilling, Fluid Transfer
Equipment
Process Pipework and Pipelines, Valve
Control
Safety Communication
Sector
Upstream Oil and Gas
Setting
Marine Waters
Link
Checked , working
Record
bsee-0f841fd020 · added 2 October 2026

Report a problem with this record