Safety Flash
Failure of AHC cylinder causing oil leak to deck
Read at IMCAOpens the publisher’s page on imca-int.com
Summary
An offshore vessel’s heave-compensated crane suffered a hydraulic cylinder failure during jumper installation. Worn seals allowed oil to accumulate behind the piston, leading to end-cover bolt failure. Approximately 150 litres remained contained aboard. Proposed actions address pressure alarms, seal inspections, return-filter checks and planned cylinder overhaul.