Skip to content
IMCASafety Flash

Connection failure during lifting operation

Publisher
IMCA · International Marine Contractors Association
Type
Safety Flash
Reference
IMCA SF 26/22
Date
Themes
Competence and TrainingCrane and RiggingLifting OperationsLine of Fire

Summary

A tugger-line splice opened while positioning a lifting tool, highlighting the need for engineered connections, competent splicing and inspection.

Summary written automatically from the title and document text.

IMCA SF 26/22. Themes: competence and training, crane and rigging, lifting operations, line of fire.

Open at IMCA

Safety flashes are public web pages on imca-int.com; the PDF is a rendering of the page. Guidance documents such as M203 need IMCA access to open the native file.

© IMCA, all rights reserved; this site links to IMCA's own pages and hosts no publisher download files.

Publisher link checked · working

Related documents