IMCASafety Flash
Uncontrolled movement of a riser
- Publisher
- IMCA · International Marine Contractors Association
- Type
- Safety Flash
- Reference
- IMCA SF 11/18
- Date
- Themes
- Control of WorkLifting OperationsLine of FireManagement of Change
Summary
An added rigging arrangement was not managed through change control, allowing a riser to move unexpectedly during deployment.
Summary written automatically from the title and document text.
IMCA SF 11/18. Themes: control of work, lifting operations, line of fire, management of change.
Safety flashes are public web pages on imca-int.com; the PDF is a rendering of the page. Guidance documents such as M203 need IMCA access to open the native file.
© IMCA, all rights reserved; this site links to IMCA's own pages and hosts no publisher download files.
Publisher link checked · working