Skip to content
IMCASafety Flash

Master link failure during testing of overboarding chute

Publisher
IMCA · International Marine Contractors Association
Type
Safety Flash
Reference
IMCA SF 18/14
Date
Themes
Control of WorkCrane and RiggingLifting Operations

Summary

A master link failed while an overboarding chute was being function tested, highlighting inadequate planning and assessment of over-pull loads.

Summary written automatically from the title and document text.

IMCA SF 18/14. Themes: control of work, crane and rigging, lifting operations.

Open at IMCA

Safety flashes are public web pages on imca-int.com; the PDF is a rendering of the page. Guidance documents such as M203 need IMCA access to open the native file.

© IMCA, all rights reserved; this site links to IMCA's own pages and hosts no publisher download files.

Publisher link checked · working

Related documents