Safety Flash
Lifting post failure on survey equipment
Read at IMCAOpens the publisher’s page on imca-int.com
Summary
A survey equipment lifting post fractured during deployment through the splash zone at about 5 m depth. A safety tether and electrical umbilical retained the equipment, which divers re-rigged for recovery. The investigation identified inadequate allowance for splash-zone forces; actions included suspending the arrangement and requiring a basket with certified lifting points pending suitable design and testing.