Safety Flash
Crane motion reference unit (MRU) malfunctions after overheating
Read at IMCAOpens the publisher’s page on imca-int.com
Summary
During FPSO mooring-chain inspection, a crane unexpectedly left active heave compensation mode and paid out approximately three to four metres of wire. An overheated motion reference unit supplied spurious signals, triggering shutdown. The flash describes cooling improvements, an air-conditioning trip alarm and start-up inspection, alongside further measures considered.