IMCASafety Flash
Chain hoist paid out unsupervised near running main engine
- Publisher
- IMCA · International Marine Contractors Association
- Type
- Safety Flash
- Reference
- IMCA SF 01/24
- Date
- Themes
- Crane and RiggingLifting OperationsMachinery and Equipment
Summary
Motorman observed the hoist’s chain with hook to have “paid out” fully and created a dangerous condition near to main engine
IMCA SF 01/24. Themes: crane and rigging, lifting operations, machinery and equipment.
Safety flashes are public web pages on imca-int.com; the PDF is a rendering of the page. Guidance documents such as M203 need IMCA access to open the native file.
© IMCA, all rights reserved; this site links to IMCA's own pages and hosts no publisher download files.
Publisher link checked · working