Investigation Report
Failure of controllable pitch propeller of chemical tanker Key Bora resulting in contact with jetty
Read at MAIBOpens the publisher’s page on gov.uk
Summary
MAIB investigates Key Bora’s contact with a Hull jetty following inadequate controllable-pitch propeller astern response. Timed tests identified delay in the closed-loop control system. The report examines commissioning parameters, missing performance standards, pilot testing, backup-control familiarity and communication difficulties, and recommends corrective work, propulsion-failure drills and backup-system testing.