Skip to content
IADCSafety Alert

Failure of Annular BOP Element

Publisher
IADC · International Association of Drilling Contractors
Type
Safety Alert
Reference
IADC Alert 00-19
Date
Themes
Inspection and MaintenancePressure Systems

Summary

An Annular BOP was delivered to a rig with a new element installed.

IADC Alert 00-19. Themes: inspection and maintenance, pressure systems.

Open at IADC

Links open the alert page on iadc.org; no login is needed.

© International Association of Drilling Contractors, all rights reserved; this site indexes titles and links to IADC's own copies and hosts none.

Publisher link checked · working

Related documents