Investigation Report
Macondo Volume 2 Final Report
Publisher PageOpens the publisher’s page on csb.gov
Summary
Volume 2 examines the Deepwater Horizon blowout preventer’s failure to seal the Macondo well, including off-centre drillpipe buckling, miswired solenoid valves and emergency-system assurance gaps. It uses forensic testing and modelling to assess barrier performance, comparing regulatory approaches and recommending lifecycle management and independent verification of safety-critical elements.