Investigation Report

Pressurised BOP Fluid Release Injured Engineer During SPM Valve O-Ring Replacement

BSEEBureau of Safety and Environmental Enforcement

06-09-2015 10:15 G15607 GC 743 LTA (>3 days) / Required Evacuation

Read at BSEEOpens the document on bsee.gov

Summary

A subsea engineer on the West Auriga drillship suffered facial injuries when pressurised BOP fluid escaped during SPM valve O-ring replacement. The investigation identified residual pressure, a gauge stuck at zero, a leaking relief valve, closed isolation valves, inadequate assessment of the added task and awkward valve positioning.

Topics

About This Record
Original title
06-09-2015 10:15 G15607 GC 743 LTA (>3 days) / Required Evacuation
Publisher
Bureau of Safety and Environmental Enforcement
Type
Investigation Report
Date
Unknown
Topic
Line of Fire, Mechanical Failure, Pressure Systems
Activity
Inspection and Maintenance, Pressure Testing
Equipment
Blowout Preventer, Valve
Control
Energy and Process Isolation, Risk Assessment
Sector
Upstream Oil and Gas
Setting
Vessel
Link
Checked , working