Summary
BSEE investigates a nitrogen-cylinder rupture aboard Helix Q5000 during workover operations. Three personnel sustained minor shrapnel injuries. The report identifies corrosion-related wall loss, inadequate coating protection, incomplete visual inspections and poor rack drainage. It describes muster and cylinder venting, alongside planned nitrogen generation, protective barriers and changes to vendor selection and inspection.
Classifications: Corrosion; corrosion damage.
Classifications: Line of fire; struck-by hazards.
Classifications: Pressure systems; stored pressure; pressurised systems; pressurized systems.
Classifications: Structural and asset integrity; asset integrity; structural integrity.
Classifications: Inspection and maintenance; asset inspection; equipment maintenance.
Classifications: Gas cylinder; compressed gas bottle; gas cylinders.
Classifications: Emergency response; emergency preparedness.
Classifications: Job safety analysis; JSA; job hazard analysis; JHA.
Classifications: Non-destructive testing; NDT; non-destructive examination; NDE.
Classifications: Pre-use checks; pre-use inspection.
Classifications: Upstream oil and gas; oil and gas extraction; upstream petroleum.