Investigation Report
Well Kick During Plugging Back for a Sidetrack
Read at BSEEOpens the document on bsee.gov
Summary
Investigation of a well-control event during plugging back for a sidetrack at Green Canyon Block 236. Packer leakage and embrittled elements were reported, with inadequate mud weight contributing. The kick was estimated at over 100 barrels; drilling mud arrived after roughly 30 hours and killed the well uneventfully.