Investigation Report
Oil Spill Following Production Surges and Oil Carryover
Read at BSEEOpens the document on bsee.gov
Summary
Investigation of an estimated 3.5-barrel oil spill at MP 299 FP on 18 July 2006. The report attributes oil carryover to production surges and identifies leaking valves, difficult level observation and limited operator familiarity as contributing factors. Corrective actions address backflow prevention, vessel operating levels, sight-glass visibility and shift experience.