Investigation Report
Drawworks Electrical-Panel Contactors Burned Out During Casing Work
Read at BSEEOpens the document on bsee.gov
Summary
An investigation examines a drawworks electrical-panel failure during casing work on the Diamond Ocean Ambassador. Two contactors burned out; investigators suspected a broken hinge pin had allowed an uneven connection. Replacement contactors were installed and tested. The rig was down for 15.5 hours, with no injuries or pollution reported.