Skip to content
NOPSEMAGuidance

ALARP in the context of well integrity guidance note

Publisher
NOPSEMA · National Offshore Petroleum Safety and Environmental Management Authority
Type
Guidance
Reference
N-04600-GN1616
Date
Themes
Control of WorkStructural and Asset Integrity

Summary

Explains how well operations management plans can demonstrate that well integrity risks have been reduced to ALARP.

Summary written automatically from the title and document text.

N-04600-GN1616. Themes: control of work, structural and asset integrity.

Open at NOPSEMA

Links open the PDF on nopsema.gov.au; no login is needed.

© Commonwealth of Australia (NOPSEMA); this site links to NOPSEMA's own copies and hosts none.

Related documents