Guidance
MODU mooring systems in cyclonic conditions information paper
Read at NOPSEMAOpens the document on nopsema.gov.au
Summary
This information paper examines cyclonic mooring risks for mobile offshore drilling units. It discusses site-specific design return periods, met-ocean and seabed inputs, component degradation, installation assurance and change management. Operational guidance covers line-tension management, inspection performance standards, emergency preparedness and consideration of position monitoring during cyclone evacuation.