IMCASafety Flash
ROV main lift failure
- Publisher
- IMCA · International Marine Contractors Association
- Type
- Safety Flash
- Reference
- IMCA SF 34/21
- Date
- Themes
- Inspection and MaintenanceLifting OperationsMachinery and Equipment
Summary
An ROV main-lift termination failed because of inadequate cone size, strand distribution and resin application.
Summary written automatically from the title and document text.
IMCA SF 34/21. Themes: inspection and maintenance, lifting operations, machinery and equipment.
Safety flashes are public web pages on imca-int.com; the PDF is a rendering of the page. Guidance documents such as M203 need IMCA access to open the native file.
© IMCA, all rights reserved; this site links to IMCA's own pages and hosts no publisher download files.
Publisher link checked · working