Safety Flash
Umbilical termination failure and loss of ROV
Read at IMCAOpens the publisher’s page on imca-int.com
Summary
An ROV and its TMS fell to the seabed during recovery after an umbilical termination detached. Examination identified poor termination workmanship and defects, alongside inadequate subcontractor skill and quality verification. Revised procedures require photographic evidence of assembly steps, with quality surveillance recommended for subcontractors. No personnel were injured.