Safety Flash
Unsafe lifting operations
Read at IMCAOpens the publisher’s page on imca-int.com
Summary
Two vessel lifting interventions concern a winch frame beneath scaffolding being dismantled and a metal structure offered for loading without available lifting certificates. The flash discusses conflicting activities, an unsafe partial-lifting and rolling method, weather-related haste, lift planning, equipment colour coding and checks before and after work.