Skip to content
IMCASafety Flash

Dropped pipe incidents with potentially fatal consequences

Publisher
IMCA · International Marine Contractors Association
Type
Safety Flash
Reference
IMCA SF 20/18
Date
Themes
Contractor ManagementDropped ObjectsLifting OperationsLine of Fire

Summary

Pipe loadout failures involved inadequate task planning, communication, supervision, equipment selection and subcontractor competence.

Summary written automatically from the title and document text.

IMCA SF 20/18. Themes: contractor management, dropped objects, lifting operations, line of fire.

Open at IMCA

Safety flashes are public web pages on imca-int.com; the PDF is a rendering of the page. Guidance documents such as M203 need IMCA access to open the native file.

© IMCA, all rights reserved; this site links to IMCA's own pages and hosts no publisher download files.

Publisher link checked · working

Related documents