Skip to content
IMCASafety Flash

High potential near-miss – Lifting equipment failure

Publisher
IMCA · International Marine Contractors Association
Type
Safety Flash
Reference
IMCA SF 10/13
Date
Themes
Control of WorkCrane and RiggingLifting OperationsManagement of Change

Summary

A Member has reported an incident in which there was a potentially catastrophic failure of a lifting sling.

IMCA SF 10/13. Themes: control of work, crane and rigging, lifting operations, management of change.

Open at IMCA

Safety flashes are public web pages on imca-int.com; the PDF is a rendering of the page. Guidance documents such as M203 need IMCA access to open the native file.

© IMCA, all rights reserved; this site links to IMCA's own pages and hosts no publisher download files.

Publisher link checked · working

Related documents