Safety Flash
Electrical isolation: Failing to “prove dead” at the point of work
Read at IMCAOpens the publisher’s page on imca-int.com
Summary
This safety flash examines failures to verify that electrical equipment is dead at the actual work location rather than only at a remote isolation point. Two examples describe personnel accessing live terminals after selecting the wrong thruster or ROV. It emphasises following proving-dead protocols at the point of work.