Skip to content
IMCASafety Flash

Pipe handling frame incident during diving operation

Publisher
IMCA · International Marine Contractors Association
Type
Safety Flash
Reference
IMCA SF 09/04
Date
Themes
Control of WorkDivingLifting OperationsLine of Fire

Summary

A diver encountered a descending pipe handling frame after inadequate position verification and communication during a shift change.

Summary written automatically from the title and document text.

IMCA SF 09/04. Themes: control of work, diving, lifting operations, line of fire.

Open at IMCA

Safety flashes are public web pages on imca-int.com; the PDF is a rendering of the page. Guidance documents such as M203 need IMCA access to open the native file.

© IMCA, all rights reserved; this site links to IMCA's own pages and hosts no publisher download files.

Publisher link checked · working

Related documents