Skip to content
IMCASafety Flash

Failure of a ½” BSP cap under pressure on well service work

Publisher
IMCA · International Marine Contractors Association
Type
Safety Flash
Reference
IMCA SF 06/99
Date
Themes
Control of WorkPressure Systems

Summary

A pressure-testing cap appeared to blow off, emphasising correct engagement, tightening and inspection of temporary pressure fittings.

Summary written automatically from the title and document text.

IMCA SF 06/99. Themes: control of work, pressure systems.

Open at IMCA

Safety flashes are public web pages on imca-int.com; the PDF is a rendering of the page. Guidance documents such as M203 need IMCA access to open the native file.

© IMCA, all rights reserved; this site links to IMCA's own pages and hosts no publisher download files.

Publisher link checked · working

Related documents