IMCASafety Flash
Failure of a ½” BSP cap under pressure on well service work
- Publisher
- IMCA · International Marine Contractors Association
- Type
- Safety Flash
- Reference
- IMCA SF 06/99
- Date
- Themes
- Control of WorkPressure Systems
Summary
A pressure-testing cap appeared to blow off, emphasising correct engagement, tightening and inspection of temporary pressure fittings.
Summary written automatically from the title and document text.
IMCA SF 06/99. Themes: control of work, pressure systems.
Safety flashes are public web pages on imca-int.com; the PDF is a rendering of the page. Guidance documents such as M203 need IMCA access to open the native file.
© IMCA, all rights reserved; this site links to IMCA's own pages and hosts no publisher download files.
Publisher link checked · working