Safety Flash
Water ingress to bow thruster space
Read at IMCAOpens the publisher’s page on imca-int.com
Summary
Flooding in a vessel’s bow thruster space damaged essential components and postponed sea trials after an acknowledged bilge alarm was forgotten during watch handover. The flash discusses watch-keeping instructions, immediate alarm investigation, bilge-system familiarisation, regular filter and non-return valve checks, and verification of system drawings.