Safety Flash
Hose management and chemicals: crew person felt ill
Read at IMCAOpens the publisher’s page on imca-int.com
Summary
An engineer coughed and felt unwell while flushing a hose before filling a cooling-water system, with no long-term ill-effects. The member attributed the incident to poor hose management: residual cooling agent remained after previous use. Actions included separate hoses for cooling agent and non-potable water, plus flushing and drying before storage.