Safety Alert
Nitrogen Cylinder Rupture
Read at IADCOpens the publisher’s page on iadc.org
Summary
A nitrogen cylinder charged to 2,400 psi ruptured at its base after rig crews positioned a cylinder rack for accumulator pre-charging. The rack was not connected to charge the accumulator. The rupture scattered the rack, debris and the remaining 11 cylinders around the immediate and port aft areas of the rig.