Safety Alert
Electrical Troubleshooting Incident
Read at IADCOpens the publisher’s page on iadc.org
Summary
An electrician investigating the electrical supply to a main engine-cooling pump tested fuses inside a motor control centre using a multimeter on its resistance scale. The meter probe shorted across two fuses, causing flash burns to the electrician’s hands and a consequential rig blackout.