Investigation Report
Seadrill – West Hercules – investigation of unintentional disconnection of LMRP
Read at HavtilOpens the document on havtil.no
Summary
Investigation of an unintended riser-package disconnection on West Hercules during drilling preparations in the Barents Sea. An incorrectly installed ADS trigger valve initiated disconnection and automatic shear-ram closure against uncuttable drill collars. The report examines installation risk assessment, competence, procedures, maintenance, change management and operator oversight, distinguishing actual damage from potential well-control consequences.