Investigation Report
Aker BP - Tambar - Investigation into walkway incident
Aker BP - Tambar - Investigation into walkway incident
- Havtil
- Investigation Report
- Unknown
- Human factorsRisk managementStructural and asset integrity
- Personnel transfer
- Gangway
- Operating and work proceduresRisk assessmentSafety communication
- Marine industryUpstream oil and gas
- Offshore installationVessel
Summary
Investigation of a motion-compensated walkway test landing at Tambar that damaged railings and other equipment. It examines thrust landing, accidental-load design requirements and planning deficiencies, including late hazard identification, incomplete technical verification and inadequate information exchange. Findings distinguish actual west-side damage from potential consequences at the south landing area.
Classifications: Human factors; human performance; ergonomics.
Classifications: Risk management; risk evaluation.
Classifications: Structural and asset integrity; asset integrity; structural integrity.
Classifications: Personnel transfer; crew transfer.
Classifications: Gangway; walk-to-work gangway; W2W gangway.
Classifications: Operating and work procedures.
Classifications: Risk assessment; hazard assessment.
Classifications: Safety communication; toolbox talk; toolbox talks.
Classifications: Marine industry; shipping industry; maritime sector.
Classifications: Upstream oil and gas; oil and gas extraction; upstream petroleum.
Classifications: Offshore installation; offshore platform; offshore rig.
Classifications: Vessel; aboard ship; onboard vessel.