Investigation Report
Equinor - Hammerfest LNG - Order after investigation of hydrates in safety valves
Read at HavtilOpens the document on havtil.no
Summary
Investigation of prolonged overpressure-barrier impairments at Hammerfest LNG on Melkøya. Hydrates prevented some pressure safety valves from functioning, while the affected total remained unknown. The report examines heat tracing and insulation, maintenance and testing interfaces, delayed risk assessment and management follow-up, and corrective measures installed during plant shutdown.