Production PINCs
- Publisher
- BSEE · Bureau of Safety and Environmental Enforcement
- Type
- Guidance
- Date
- Themes
- Hot Work and FireInspection and MaintenanceProcess SafetyRegulation and Legislation
Summary
BSEE inspection items for production operations covering safety shutdown devices, flaring and venting, temporary equipment, firewater, gas-detection and fire-detection systems.
Summary written automatically from the title and document text.
Themes: hot work and fire, inspection and maintenance, process safety, regulation and legislation.
Extract from the document (first pages)
Text extracted automatically from the publisher’s PDF so it can be searched. Layout, tables and figures are lost and the extract stops after the first pages; read the document itself at BSEE.
PRODUCTION OPERATIONS
General
P-100 ARE PRESSURE-RECORDER DEVICES USED TO DETERMINE THE CURRENT OPERATING PRESSURE RANGES MAINTAINED AT THE LESSEE'S NEAREST OCS FIELD OFFICE? (Last Update -Feb 2022) Authority: 30 CFR 250.851(b) Enforcement Actions: W 30 CFR 205.852(a)(2) 30 CFR 250.865(b) 30 CFR 250.858(b)
P-101 DO ALL SAFETY SHUTDOWN DEVICES, VALVES, AND PRESSURE SENSORS FUNCTION IN A MANUAL RESET MODE? (Last Update -Feb 2022) Authority: 30 CFR 250.853(a) Enforcement Actions: C
P-102 DO END-DEVICES (I.E., SHUTDOWN DEVICES, SHUTDOWN VALVES, SSVs, AND OTHER SHUTDOWN CONTROLS) PERFORM THEIR DESIGNED FUNCTION UPON RECEIVING A SIGNAL (PNEUMATIC OR ELECTRONIC) TRANSMITTED BY A SENSOR THAT HAS DETECTED AN ABNORMALCONDITION? (Last Update -Feb 2022) Authority: 30 CFR 250.841(a) Enforcement Actions: C
P-103 IS EACH SURFACE OR SUBSURFACE SAFETY DEVICE, WHICH IS BYPASSED OR BLOCKED OUT OF SERVICE, OUT OF SERVICE DUE TO START-UP, TESTING, OR MAINTENANCE AND IS IT FLAGGED AND MONITORED BY PERSONNEL? (Last Update -Feb 2022) Authority: 30 CFR 250.869(a) Enforcement Actions: C 30 CFR 250.1004(c)
P-104 IS THE PLATFORM PROTECTED WITH A BASIC AND ANCILLARY SURFACE SAFETY SYSTEM DESIGNED, ANALYZED, INSTALLED, TESTED, AND MAINTAINED IN OPERATING CONDITION IN ACCORDANCE WITH THE PROVISIONS OF API RP 14C RECOMMENDED PRACTICE FOR ANALYSIS, DESIGN, INSTALLATION, AND TESTING OF BASIC SURFACE SAFETY SYSTEMS FOR OFFSHORE PRODUCTION PLATFORMS (INCORPORATED BY REFERENCE AS SPECIFIED IN 30 CFR250.198). (Last Update -Feb 2022) Authority: 30 CFR 250.841(a) Enforcement Actions: W/C/S
P-105 IS EACH OPEN-ENDED LINE CONNECTED TO PRODUCING FACILITIES AND WELLS PLUGGED OR BLIND- FLANGED? (Last Update -Feb 2022) Authority: 30 CFR 250.869(d) Enforcement Actions: W/C
P-106 IS NON-METALLIC PIPING SUCH AS POLYVINYL CHLORIDE, CHLORINATED POLYVINYL CHLORIDE, AND REINFORCED FIBERGLASS USED ONLY ON ATMOSPHERIC AND NON- HYDROCARBON SERVICE OVERBOARD WATERPIPING? (Last Update -Feb 2022) Authority: 30 CFR 250.868 Enforcement Actions: C
Flaring and Venting of Gas
P-107 HAS APPROVAL BEEN RECEIVED WHEN THE OPERATOR HAS FLARED OR VENTED OIL-WELL GAS OR GAS- WELL FLASH GAS IN EXCESS OF 48 CONTINUOUS HOURS OR 144 CUMULATIVE HOURS DURING ANY MONTH WHEN EQUIPMENT FAILS TO WORK PROPERLY, DURING EQUIPMENT MAINTENANCE AND REPAIR, OR TO RELIEVE SYSTEM PRESSURES? (Last Update -Feb 2022) Authority: 30 CFR 250.1160(a)(6)(i) Enforcement Actions: W/C 30 CFR 250.1160(a)(6)(iii) 30 CFR 250.1160(a)(7)(i) 30 CFR 250.1160(a)(7)(iii)
P-108 HAS APPROVAL BEEN RECEIVED WHEN THE OPERATOR HAS FLARED OR VENTED PRIMARY GAS-WELL GAS IN EXCESS OF 2 CONTINUOUS HOURS WHEN EQUIPMENT FAILS TO WORK PROPERLY, DURING EQUIPMENT MAINTENANCE AND REPAIR, OR TO RELIEVE SYSTEMPRESSURES? (Last Update -Feb 2022) Authority: 30 CFR 250 1160(a)(6)(ii) Enforcement Actions: W/C 30 CFR 250 1160(a)(7)(ii)
P-109 HAS THE OPERATOR RECEIVED APPROVAL WHEN FLARING OR VENTING GAS, BEYOND THE THRESHOLDS ALLOWED TO BURN WASTE PRODUCTS SUCH AS H2S, OR TO RESTART A FACILITY THAT WAS SHUT IN BECAUSE OF WEATHER CONDITIONS SUCH AS AHURRICANE, OR HAVE THEY REPORTED THE BLOWDOWN OF A TRANSPORTATION PIPELINE DOWNSTREAM OF THE ROYALTY METER WITHIN 72 HOURS? (Last Update -Feb 2022) Authority: 30 CFR 250.1160(a)(1) Enforcement Actions: W/C 30 CFR 250.1160(a)(2) 30 CFR 250.1160(a)(3)(i)
P-110 DOES THE OPERATOR HAVE APPROVAL TO FLARE OR VENT GAS BEYOND 48 CUMULATIVE HOURS PER UNLOADING OR CLEANING OR TESTING OPERATION ON A SINGLE COMPLETION? (Last Update -Feb 2022) Authority: 30 CFR 250.1160(a)(4) Enforcement Actions: W/C
P-112 HAS THE OPERATOR VERIFIED THAT OIL-WELL GAS AND/OR GAS-WELL GAS VAPORS FLARED OR VENTED FROM STORAGE VESSELS OR OTHER LOW PRESSURE PRODUCTION VESSELS AVERAGE NO MORE THAN 50 MCF/DAY DURING A CALENDAR MONTH AND THAT THESE SMALL VOLUMES THAT CANNOT BE ECONOMICALLY RECOVERED? (Last Update -Feb 2022) Authority: 30 CFR 250.1160(a)(5) Enforcement Actions: W/C
P-113 DOES THE OPERATOR MAINTAIN RECORDS FOR A MINIMUM OF 2 YEARS AT THE FACILITY DETAILING DAILY VOLUMES FLARED, VENTED, AND/OR LIQUID HYDROCARBONS BURNED; HOURS FLARED, VENTED, AND/OR BURNED, ON A DAILY AND MONTHLY CUMULATIVE BASIS; REASONS FOR FLARING, VENTING, AND/OR BURNING; WELLS CONTRIBUTING TO THE FLARING, VENTING, AND/OR BURNING ALONG WITH GAS-OIL RATIOS AND DOCUMENTATION OF ALL REQUIRED APPROVALS? (Last Update -Feb 2023) Authority: 30 CFR 250.1163(c)(1) Enforcement Actions: W 30 CFR 250.1163(c)(3)
P-114 FOR FACILITIES THAT PROCESS MORE THAN AN AVERAGE OF 2,000 BOPD IN A CALENDAR MONTH, HAS THE OPERATOR INSTALLED FLARE/VENT METERS WITHIN 120 DAYS AFTER THE END OF THE MONTH IN WHICH THE AVERAGE AMOUNT OF OIL PROCESSED EXCEEDS 2,000 BOPD, AND DOES THE OPERATOR MAINTAIN METER CALIBRATION ANDMAINTENANCE RECORDS, AND METER RECORDINGS DETAILING BEGINNING TIMES, END TIMES AND VOLUMES FOR ALL FLARING AND VENTING INCIDENTS, FOR A MINIMUM OF 2 YEARS AT THE FACILITY? (Last Update -Feb 2022) Authority: 30 CFR 250.1163(a) Enforcement Actions: W/C 30 CFR 250.1163(d)
Production Notification
P-120 HAS THE DISTRICT MANAGER BEEN NOTIFIED, PRIOR TO THE COMMENCEMENT OF PRODUCTION, WHEN A FACILITY IS READY FOR A PREPRODUCTION TEST AND AN INSPECTION OF THE INTEGRATED SAFETY SYSTEM? (Last Update -Feb 2022) Authority: 30 CFR 250.880(a) Enforcement Actions: C/S
P-121 DID THE OPERATOR EQUIP TEMPORARY QUARTERS WITH ALL SAFETY DEVICES REQUIRED BY API RP 14C, APPENDIX C, AND RECEIVE APPROVAL FROM THE APPROPRIATE DISTRICT MANAGER PRIOR TO INSTALLING? (Last Update -Feb 2022) Authority: 30 CFR 250.867(a) Enforcement Actions: W/C
P-122 DID THE OPERATOR RECEIVE APPROVAL FROM THE APPROPRIATE DISTRICT MANAGER PRIOR TO USING TEMPORARY EQUIPMENT ASSOCIATED WITH THE PRODUCTION PROCESS SYSTEM, INCLUDING EQUIPMENT USED FOR WELL TESTING AND/OR WELLCLEAN-UP? (Last Update -Feb 2022) Authority: 30 CFR 250.867(c) Enforcement Actions: W/C
P-123 DID THE OPERATOR RECEIVE APPROVAL FROM THE APPROPRIATE DISTRICT MANAGER FOR TEMPORARY GENERATORS THAT WOULD REQUIRE A CHANGE TO THE ELECTRICAL ONE LINE DIAGRAM? (Last Update - Nov 2025) Authority: 30 CFR 250.867(d) Enforcement Actions: W/C
Fire Water System
P-130 IS AN APPROVED FIREWATER SYSTEM, CONSISTING OF RIGID PIPE WITH FIRE-HOSE STATIONS OR FIXED FIREWATER MONITORS, OR IS AN OPERABLE CHEMICAL SYSTEM, APPROVED BY THE DISTRICT MANAGER, INSTALLED TO PROVIDE PROTECTION IN ALL AREAS WHERE PRODUCTION-HANDLING EQUIPMENT IS LOCATED? (Last Update -Mar 2026) Authority: 30 CFR 250.859 Enforcement Actions: S 30 CFR 250.860
P-131 IS A FIXED WATERSPRAY SYSTEM INSTALLED IN ENCLOSED WELL-BAY AREAS WHERE HYDROCARBON VAPORS MAY ACCUMULATE? (Last Update -Feb 2022) Authority: 30 CFR 250.859(a) Enforcement Actions: S
P-132 IS FUEL OR POWER FOR FIREWATER PUMP DRIVERS AVAILABLE FOR AT LEAST 30 MINUTES OF RUN TIME DURING A PLATFORM SHUT-IN, AND ARE ALL NEW FIREWATER PUMPDRIVERS EQUIPPED WITH AUTOMATIC STARTING CAPABILITIES UPON ACTIVATION OF THE ESD? (Last Update -Feb 2022) Authority: 30 CFR 250.859(a)(2) Enforcement Actions: S
P-133 IS A DIAGRAM OF THE FIREFIGHTING SYSTEM SHOWING THE LOCATION OF ALL FIREFIGHTING EQUIPMENT POSTED IN A PROMINENT PLACE ON THEFACILITY? (Last Update -Feb 2022) Authority: 30 CFR 250.859(a)(3) Enforcement Actions: W
P-134 WHEN FOAM FIREFIGHTING SYSTEMS ARE INSTALLED AS PART OF THE APPROVED FIREFIGHTING SYSTEM THAT PROTECTS PRODUCTION HANDLING AREAS, HAS THE OPERATOR CONDUCTED ANNUAL INSPECTIONS OF THE FOAM CONCENTRATES AND THEIR TANKS OR STORAGE CONTAINERS FOR EVIDENCE OF EXCESSIVE SLUDGING OR DETERIORATION HAS THE OPERATOR SENT SAMPLES OF THE FOAM CONCENTRATE TO THE MANUFACTURER OR AUTHORIZED REPRESENTATIVE FOR QUALITY CONDITION TESTING, AND IS THE SYSTEM IN GOOD WORKING ORDER? (Last Update - Aug 2025) Authority: 30 CFR 250.859(a)(6) Good Working Order Enforcement Actions: W/C/S 30 CFR 250.861 Foam Firefighting System
Gas-Detection System
P-150 ARE CONTINUOUSLY MONITORING GAS-DETECTION SYSTEMS INSTALLED IN ALL INADEQUATELY VENTILATED, ENCLOSED CLASSIFIED AREAS, AND SIGNAL AN ALARM AT NO GREATER THAN 25 PERCENT LEL, INITIATING A SHUT-IN SEQUENCE (MANUAL-RESET TYPE) WHEN LEVELS REACH NO MORE THAN 60 PERCENT LEL? (Last Update -Feb 2022) Authority: 30 CFR 250.862(a) Enforcement Actions: W/C 30 CFR 250.862(b)
P-153 IS A FUEL-GAS ODORANT OR AN AUTOMATIC GAS-DETECTION AND ALARM SYSTEM INSTALLED IN ENCLOSED, CONTINUOUSLY MANNED AREAS OF THE FACILITY WHICH ARE PROVIDED WITH FUEL GAS? (Last Update -Feb 2022) Authority: 30 CFR 250.862(c) Enforcement Actions: W/C
P-154 IS EACH GAS-DETECTION SYSTEM INSTALLED IN ACCORDANCE WITH API RP 14C, API RP 14G, AND API RP 14F? (Last Update -Feb 2022) Authority: 30 CFR 250.862(e) Enforcement Actions: C
P-155 IS EACH COMBUSTIBLE GAS-DETECTION SYSTEM TESTED FOR OPERATION AND RECALIBRATED AT LEAST ONCE EVERY 3 MONTHS? (Last Update -Feb 2022) Authority: 30 CFR 250.880(c)(3)(ii) Enforcement Actions: W/C
Fire-Detection System
P-170 ARE FIRE (FLAME, HEAT, OR SMOKE) SENSORS OF THE CONTINUOUS MONITORING TYPE AND EQUIPPED WITH A MANUAL RESET INSTALLED IN ALL ENCLOSED CLASSIFIED AREAS? (Last Update -Feb 2022) Authority: 30 CFR 250.862(a) Enforcement Actions: W/C 30 CFR 250.862(b)
P-173 IS EACH FIRE-DETECTION SYSTEM INSTALLED IN ACCORDANCE WITH API RP 14C, API RP 14G, AND API RP 14F? (Last Update -Feb 2022) Authority: 30 CFR 250.862(e) Enforcement Actions: C
P-175 DOES ACTIVATION OF THE FIRE LOOP SYSTEM OR OTHER FIRE DETECTION SYSTEMS, OR AUTOMATIC DETECTION OF AN ABNORMAL CONDITION, INITIATE SURFACE AND SUBSURFACE SHUT-IN? (Last Update -Feb 2022) Authority: 30 CFR 250.818(c) Enforcement Actions: C/S 30 CFR 250.841(a)
P-176 IS EACH FIRE-DETECTION SYSTEM TESTED FOR OPERATION AND RE-CALIBRATED AT LEAST ONCE EVERY 3 MONTHS? (Last Update -Feb 2022) Authority: 30 CFR 250.880(c)(3)(ii) Enforcement Actions: W/C
P-177 ARE OPEN FLAMES OR DEVICES OPERATING AT TEMPERATURES WHICH COULD IGNITE A METHANE-AIR MIXTURE NOT USED FOR TESTING? (Last Update -Feb 2022) Authority: 30 CFR 250.880(c)(3)(ii) Enforcement Actions: C
Fusible Material
P-200 ARE TSES LOCATED IN ACCORDANCE WITH TABLE C1 OF API RP 14C? (Last Update -Feb 2022) Authority: 30 CFR 250.841(a) Enforcement Actions: C 30 CFR 250.1004(b)(9) 30 CFR 250.865(f)
P-209 IS A FIRE DETECTION SYSTEM LOCATED IN ACCORDANCE WITH API RP 14 J APPENDIX B.1.1.2 FOR ELECTRIC MOTORS? (Last Update -Feb 2022) Authority: 30 CFR 250.800 Enforcement Actions: C 30 CFR 250.901(a)(14)
P-210 IS A TSE LOCATED WITHIN 5 FEET OF EACH BSDV? (Last Update -Feb 2022) Authority: 30 CFR 250.835(d) Enforcement Actions: C
ESD System
P-231 IS AN OPERABLE ESD STATION LOCATED AS REQUIRED BY APPENDIX C OF API RP 14C? (Last Update -Feb 2022) Authority: 30 CFR 250.855 Enforcement Actions: S
P-238 IS A SCHEMATIC OF THE ESD SYSTEM MAINTAINED ON THE FACILITY OR AT THE LESSEE'S NEAREST OCS FIELD OFFICE? (Last Update -Feb 2022) Authority: 30 CFR 250.855(b) Enforcement Actions: W
P-239 IS THE ESD SYSTEM EQUIPPED WITH MANUALLY OPERATED, QUICK-OPENING, AND NON-RESTRICTED VALVES? (Last Update -Feb 2022) Authority: 30 CFR 250.855(a) Enforcement Actions: S
P-240 DOES THE SSV AND SDV ON ALL OTHER PROCESS COMPONENTS CLOSE WITHIN 45 SECONDS AFTER AUTOMATIC DETECTION OF AN ABNORMAL CONDITION OR ACTIVATION OF THE ESD? (Last Update -Feb 2022) Authority: 30 CFR 250.821(b) – SSV Enforcement Actions: C/S 30 CFR 250.855 – SDV
P-241 DOES THE SURFACE-CONTROLLED SSSV CLOSE WITHIN 2 MINUTES AFTER THE ESD OR FIRE DETECTION SYSTEM SHUT-IN SIGNAL HAS CLOSED THE SSV? (Last Update -Feb 2022) Authority: 30 CFR 250.821(b) Enforcement Actions: C/S
P-242 IS EACH ESD SYSTEM TESTED FOR OPERATION? (Last Update -Feb 2022) Authority: 30 CFR 250.880(c)(3)(iii) Enforcement Actions: W/C 30 CFR 250.880(c)(4)(iv) 30 CFR 250.880(c)(4)(v)
P-243 IS EACH ESD SYSTEM TEST CONDUCTED BY ALTERNATING ESD STATIONS TO CLOSE AT LEAST ONE WELLHEAD SSV AND VERIFY SURFACE-CONTROLLED SSSV CLOSURE FOR THAT WELL AS INDICATED BY CONTROL CIRCUITRY ACTUATION? (Last Update -Feb 2022) Authority: 30 CFR 250.880(c)(3)(iii) Enforcement Actions: W/S
Subsurface Safety Devices
P-260 ARE ALL TUBING INSTALLATIONS OPEN TO A HYDROCARBON-BEARING ZONE WHICH IS CAPABLE OF NATURAL FLOW EQUIPPED WITH AN SSSV? (Last Update -Feb 2022) Authority: 30 CFR 250.810 Enforcement Actions: C 30 CFR 250.825(a)
P-261 ARE NEW COMPLETIONS (PERFORATED BUT NOT PLACED ON PRODUCTION) AND COMPLETIONS SHUT-IN FOR A PERIOD OF MORE THAN 6 MONTHS EQUIPPED WITH EITHER (1) A PUMP-THROUGH TYPE TUBING PLUG; (2) A SURFACE-CONTROLLED SSSV WITH THE SURFACE CONTROL RENDERED INOPERATIVE; OR (3) AN INJECTION VALVE CAPABLE OF PREVENTING BACK FLOW? (Last Update -Feb 2022) Authority: 30 CFR 250.815 Enforcement Actions: W 30 CFR 250.829(a)
P-262 IS A SURFACE-CONTROLLED SSSV OR AN INJECTION VALVE CAPABLE OF PREVENTING BACK FLOW INSTALLED IN EACH INJECTION WELL? (Last Update -Feb 2022) Authority: 30 CFR 250.816 Enforcement Actions: C 30 CFR 250.830 30 CFR 250.874(a)
P-263 IS A SUBSURFACE SAFETY DEVICE INSTALLED AT A DEPTH OF 100 FEET OR MORE BELOW THE SEA FLOOR WITHIN 2 DAYS AFTER PRODUCTION IS ESTABLISHED? (Last Update -Feb 2022) Authority: 30 CFR 250.814(a) Enforcement Actions: W/C 30 CFR 250.828(a)
P-264 IF THE SSSV IS REMOVED AND THE ZONE IS OPEN TO FLOW, IS FLOWING NECESSARY FOR THE OPERATION BEING CONDUCTED? (Last Update -Feb 2022) Authority: 30 CFR 250.814(c) Enforcement Actions: W/C
P-265 IS A PERSON IN THE IMMEDIATE VICINITY OF THE WELL IF THE MASTER VALVE IS OPEN AND THE SUBSURFACE SAFETY DEVICE IS NOTINSTALLED? (Last Update -Feb 2022) Authority: 30 CFR 250.817 Enforcement Actions: C
P-267 ARE ALL TUBING INSTALLATIONS IN WHICH A WIRELINE OR PUMPDOWN- RETRIEVABLE SUBSURFACE SAFETY DEVICE IS INSTALLED EQUIPPED WITH A LANDING NIPPLE WITH FLOW COUPLINGS OR OTHER PROTECTIVE EQUIPMENT ABOVE AND BELOW TO PROVIDE FOR THE SETTING OF THE SSSV? (Last Update -Feb 2022) Authority: 30 CFR 250.810 Enforcement Actions: C 30 CFR 250.818(a) 30 CFR 250.832(a)
P-268 DOES EACH SURFACE-CONTROLLED AND SUBSURFACE-CONTROLLED SSSV AND ASSOCIATED SAFETY VALVE LOCK AND LANDING NIPPLE CONFORM TO THE CERTIFICATION REQUIREMENTS IN 30 CFR 250.801 THROUGH 802? (Last Update -Feb 2022) Authority: 30 CFR 250.802 Enforcement Actions: C
P-269 WHEN THE SUBSURFACE SAFETY DEVICE HAS BEEN REMOVED FOR MORE THAN 15 DAYS HAS BSEE APPROVAL BEEN GIVEN? (Last Update -Feb 2022) Authority: 30 CFR 250.817(a) Enforcement Actions: W/C
P-270 WHEN THE SUBSURFACE SAFETY DEVICE HAS BEEN REMOVED, IS THE WELL IDENTIFIED BY A SIGN ON THE WELLHEAD STATING THAT THE SUBSURFACE SAFETY DEVICE HAS BEEN REMOVED? (Last Update -Feb 2022) Authority: 30 CFR 250.817(b) Enforcement Actions: W/C
P-271 WHEN THE SUBSURFACE SAFETY DEVICE HAS BEEN REMOVED FOR ROUTINE OPERATIONS ON A SATELLITE STRUCTURE, IS THE WELL ATTENDED? (Last Update -Feb 2022) Authority: 30 CFR 250.817(c) Enforcement Actions: W/C
Subsurface Safety Device Testing
P-280 IS EACH SURFACE-CONTROLLED SSSV INSTALLED IN A WELL TESTED WHEN INSTALLED OR REINSTALLED AND AT INTERVALS NOT EXCEEDING 6 MONTHS AND REMOVED, REPAIRED AND REINSTALLED, OR REPLACED, IF IT DOES NOT OPERATE PROPERLY? (Last Update -Feb 2022) Authority: 30 CFR 250.880(c)(1)(i) Enforcement Actions: W/C 30 CFR 250.880(c)(4)(i)
P-281 IS EACH SUBSURFACE-CONTROLLED SSSV INSTALLED IN A WELL REMOVED, INSPECTED, AND REPAIRED OR ADJUSTED, AND REINSTALLED OR REPLACED AS NECESSARY AT INTERVALS NOT EXCEEDING 6 MONTHS FOR THOSE VALVES NOT INSTALLED IN A LANDING NIPPLE AND 12 MONTHS FOR THOSE VALVES INSTALLED IN A LANDING NIPPLE? (Last Update -Feb 2022) Authority: 30 CFR 250.880(c)(1)(ii) Enforcement Actions: W/C
P-283 IS EACH TUBING PLUG INSTALLED IN A WELL TESTED FOR LEAKAGE AT INTERVALS NOT EXCEEDING 6 MONTHS AND REMOVED, REPAIRED AND REINSTALLED, OR REPLACED, IF IT LEAKS? (Last Update - Feb 2022) Authority: 30 CFR 250.880(c)(1)(iii) Enforcement Actions: W
P-284 IS EACH INJECTION VALVE INSTALLED IN A WELL INSPECTED FOR LEAKAGE AT INTERVALS NOT EXCEEDING 6 MONTHS AND REMOVED, REPAIRED AND REINSTALLED, OR REPLACED, IF IT LEAKS? (Last Update -Feb 2022) Authority: 30 CFR 250.880(c)(1)(iv) Enforcement Actions: W/C
Surface Safety Device Records
P-300 IS EACH PUMP FOR A FIREWATER SYSTEM INSPECTED AND TESTED FOR OPERATION WEEKLY AND REPAIRED OR REPLACED IF FOUND DEFECTIVE? (Last Update -Feb 2022) Authority: 30 CFR 250.880(c)(3)(i) Enforcement Actions: W/S
P-301 IS EACH PNEUMATIC PSH, PSL, LSH, LSL TESTED FOR OPERATION AT LEAST ONCE EACH MONTH, WITH NO MORE THAN 6 WEEKS ELAPSING BETWEEN TESTS? (Last Update -Feb 2022) Authority: 30 CFR 250.880(c)(3)(x) Enforcement Actions: W/C
P-305 IS EACH AUTOMATIC INLET SDV AND EACH LIQUID DISCHARGE SDV TESTED FOR OPERATION AT LEAST ONCE EACH MONTH, WITH NO MORE THAN 6 WEEKS ELAPSING BETWEEN TESTS? (Last Update -Feb 2022) Authority: 30 CFR 250.880(c)(2)(ii) Enforcement Actions: W/C 30 CFR 250.880(c)(2)(iii)
P-307 IS EACH SSV TESTED FOR OPERATION AT LEAST ONCE EACH MONTH, WITH NO MORE THAN 6 WEEKS ELAPSING BETWEEN TESTS, AND REPAIRED OR REPLACED IF FOUND DEFECTIVE? (Last Update -Feb 2022) Authority: 30 CFR 250.880(c)(2)(iv) Enforcement Actions: W/C
P-308 IS EACH FLOWLINE FSV TESTED FOR OPERATION AT LEAST ONCE EACH MONTH, WITH NO MORE THAN 6 WEEKS ELAPSING BETWEEN TESTS, AND REPAIRED OR REPLACED IF FOUND DEFECTIVE? (Last Update - Feb 2022) Authority: 30 CFR 250.880(c)(2)(v) Enforcement Actions: W/C
P-309 IS EACH TSH SHUTDOWN CONTROL ON COMPRESSOR INSTALLATIONS NONDESTRUCTIVE TESTED FOR OPERATION AT LEAST ONCE EVERY 6 MONTHS AND REPAIRED OR REPLACED IF FOUND DEFECTIVE? (Last Update -Aug 2023) Authority: 30 CFR 250.880(c)(3)(v) Enforcement Actions: W/C
P-310 IS EACH TSH TESTED FOR OPERATION ANNUALLY, NOT TO EXCEED 12 CALENDAR MONTHS BETWEEN TESTS, EXCLUDING THOSE TSH SHUTDOWN CONTROLS INPSECTED UNDER P-309 AND THOSE THAT WOULD BE DESTROYED BY TESTING? (Last Update -Aug 2023) Authority: 30 CFR 250. 880(c)(3)(iv) Enforcement Actions: W/C
P-311 IS EACH BSL TESTED FOR OPERATION AT LEAST ONCE EVERY 12 MONTHS? (Last Update -Feb 2022) Authority: 30 CFR 250.880(c)(3)(vi) Enforcement Actions: W/C
P-312 IS EACH FSL TESTED FOR OPERATION AT LEAST ONCE EVERY 12 MONTHS? (Last Update -Feb 2022) Authority: 30 CFR 250.880(c)(3)(vii) Enforcement Actions: W/C
P-313 IS EACH PSV TESTED FOR OPERATION AT LEAST ONCE EVERY 12 MONTHS? (Last Update -Feb 2022) Authority: 30 CFR 250.880(c)(2)(i) Enforcement Actions: W/C
P-314 IS EACH ELECTRONIC PSH, PSL, LSH, LSL TESTED FOR OPERATION EVERY 3 MONTHS, WITH NO MORE THAN 120 DAYS ELAPSING BETWEEN TESTS? (Last Update -Feb 2022) Authority: 30 CFR 250.880(c)(3)(ix) Enforcement Actions: W/C
P-318 IS EACH PRIMARY USV TESTED FOR OPERATION AT LEAST ONCE EVERY 3 CALENDAR MONTHS, NOT TO EXCEED 120 DAYS AND IF THE DEVICE DOES NOT FUNCTION PROPERLY, OR IF A LIQUID LEAKAGE RATE > 400 CUBIC CENTIMETERS PER MINUTE OR A GAS LEAKAGE RATE > 15 CUBIC FEET PER MINUTE IS OBSERVED, THE VALVE MUST BE REMOVED, REPAIRED, AND REINSTALLED, OR REPLACED? (Last Update -Feb 2022) Authority: 30 CFR 250.880(c)(4)(ii) Enforcement Actions: W/C
P-319 IS EACH BSDV TESTED FOR OPERATION AT LEAST ONCE EACH MONTH, NOT TO EXCEED 6 WEEKS AND IF THE DEVICE DOES NOT FUNCTION PROPERLY, OR IF A LIQUID LEAKAGE RATE OR A GAS LEAKAGE RATE IS OBSERVED, THE VALVE MUST BE REMOVED, REPAIRED, AND REINSTALLED, OR REPLACED? (Last Update - Feb 2022) Authority: 30 CFR 250.880(c)(4)(iii) Enforcement Actions: W/C
Records
P-320 DOES THE LESSEE MAINTAIN RECORDS FOR A PERIOD OF 2 YEARS AT THE LESSEE'S NEAREST OCS FIELD OFFICE THAT INCLUDE DATES AND DETAILS OF INSTALLATION, REMOVAL, INSPECTION, TESTING, REPAIRING, ADJUSTMENTS AND REINSTALLATION FOR EACH SUBSURFACE AND SURFACE SAFETY DEVICE INSTALLED? (Last Update -Feb 2022) Authority: 30 CFR 250.890(b) Enforcement Actions: W/C
P-321 HAS THE OPERATOR SUBMITED TO THE APPROPRIATED DISTRICT