Digest
Decontaminate Before Opening! — Process Safety Beacon, March 2026
Read at CCPSOpens the publisher’s page on ccps.aiche.org
Summary
A contractor suffered acid burns when residual hydrogen fluoride escaped during flange maintenance after incomplete piping decontamination. The bulletin examines missing drawings, vacuum and nitrogen purging, and reduced protective clothing. It stresses field verification of isolations, clearing trapped material and retaining full protection until piping is proven free of hazards.