Investigation Report

Mezzanine-Deck Installation Load Damaged Gas-Lift Pipework and Isolation Valve

BSEEBureau of Safety and Environmental Enforcement

03-06-2015 16:15 G27306 MC 736 A Incident >$25K - Mechanical Lifting

Read at BSEEOpens the document on bsee.gov

Summary

An investigation examines mezzanine-deck installation at the MC 736 A platform. The load jammed against pressurised gas-lift pipework, and attempts to free it damaged piping and an isolation valve. Findings identify departures from engineered lifting arrangements, inadequate hazard assessment and delayed stop-work intervention. No injuries or hydrocarbon releases were reported.

Topics

About This Record
Original title
03-06-2015 16:15 G27306 MC 736 A Incident >$25K - Mechanical Lifting
Publisher
Bureau of Safety and Environmental Enforcement
Type
Investigation Report
Date
Unknown
Topic
Pressure Systems, Structural and Asset Integrity
Activity
Lifting Operations, Rigging
Equipment
Lifting Accessories, Process Pipework and Pipelines, Valve
Control
Energy and Process Isolation, Lifting Plan, Risk Assessment, Stop-Work Authority
Sector
Upstream Oil and Gas
Setting
Offshore Installation
Link
Checked , working
Record
bsee-fe7b74e2a0 · added 2 October 2026

Report a problem with this record