Investigation Report
Unintended Emergency Disconnect Releases Completion Fluid During BOP Control Troubleshooting
Read at BSEEOpens the document on bsee.gov
Summary
An investigation examines an unintended emergency disconnect on ENSCO 8500 that released 849 barrels of calcium chloride completion fluid to sea. Troubleshooting live BOP control-panel wiring caused a relay voltage drop. Findings identify absent work authorisation, task risk assessment and procedures, alongside failures to communicate and follow an engineering bulletin.