BSEE inspection checklist of potential incidents of noncompliance for well-completion operations, fluid requirements and rig safety devices.

Summary written automatically from the title and document text.

Themes: inspection and maintenance, regulation and legislation.

Extract from the document (first pages)

Text extracted automatically from the publisher’s PDF so it can be searched. Layout, tables and figures are lost and the extract stops after the first pages; read the document itself at BSEE.

SUBPART E OIL AND GAS WELL-COMPLETION OPERATIONS (Last Updated -- January 2026)

Permit

C-500 HAS THE LESSEE RECEIVED WRITTEN APPROVAL FROM THE DISTRICT MANAGER PRIOR TO CONDUCTING COMPLETION OPERATIONS ON THE WELL?

Authority: 30 CFR 250.505 Enforcement Actions: S 30 CFR 250.513

Fluid Requirements

C-505 WHEN COMING OUT OF THE HOLE WITH DRILL PIPE, IS THE ANNULUS BEING FILLED WITH COMPLETION FLUID BEFORE THE CHANGE IN SUCH FLUID LEVEL DECREASES THE HYDROSTATIC PRESSURE 75 PSI, OR EVERY FIVE STANDS OF DRILL PIPE, WHICHEVER GIVES A LOWER DECREASE IN HYDROSTATIC PRESSURE; AND HAS THE NUMBER OF STANDS OF DRILL PIPE AND DRILL COLLARS THAT MAY BE PULLED PRIOR TO FILLING THE HOLE, AND THE EQUIVALENT DRILL FLUID VOLUME NEEDED TO FILL THE HOLE, BEEN CALCULATED AND POSTED NEAR THE OPERATOR’S STATION?

Authority: 30 CFR 250.514(c) Enforcement Actions: W

Safety Devices and Equipment

C-510 IS AN OPERABLE CROWN BLOCK SAFETY DEVICE INSTALLED TO PREVENT THE TRAVELING BLOCK FROM STRIKING THE CROWN BLOCK; AND HAS THE SAFETY DEVICE BEEN CHECKED FOR PROPER OPERATION AT LEAST ONCE A WEEK OR AFTER EACH DRILL LINE SLIPPING OPERATION; AND ARE THE RESULTS RECORDED IN THE DAILY REPORT?

Authority: 30 CFR 250.511 Enforcement Actions: S

C-515 IS AN OPERATIONAL MUD-PIT LEVEL INDICATOR, WITH BOTH AN AUDIBLE AND VISUAL WARNING, INSTALLED AND IN USE ON THE RIG/RIG UNIT’S FLOOR WHILE COMPLETION OPERATIONS ARE BEING CONDUCTED?

Authority: 30 CFR 250.514(b)(3) Enforcement Actions: S

C-520 IS A MECHANICAL, VOLUMETRIC, OR ELECTRONIC DEVICE UTILIZED TO DETERMINE THE AMOUNT OF COMPLETION FLUID REQUIRED WHEN FILLING THE HOLE?

Authority: 30 CFR 250.514(b)(2) Enforcement Actions: S 30 CFR 250.514(c)

Open at BSEE

Links open the PDF on bsee.gov; no login is needed.

US federal government work, in the public domain in the United States; this site indexes the first pages and links to BSEE's own copies, hosting no publisher download files.

Publisher link checked · working

Related documents