Investigation Report

Vessel Allision During Pipeline Riser Decommissioning

BSEEBureau of Safety and Environmental Enforcement

02-02-2020 12:30 G12142 EW 921 Structural damage - Crane - Incident >$25K

Read at BSEEOpens the document on bsee.gov

Summary

Investigation of a vessel allision during pipeline-riser decommissioning at Ewing Banks 921 A. The account examines unexpected winch payout, a wedged shackle and severed hold-back cable. Vessel bollard pull was insufficient and had not been checked against lift calculations. Damage affected the platform and vessel crane.

Topics

About This Record
Original title
02-02-2020 12:30 G12142 EW 921 Structural damage - Crane - Incident >$25K
Publisher
Bureau of Safety and Environmental Enforcement
Type
Investigation Report
Date
Unknown
Topic
Loss of Station Keeping, Vessel Collision
Activity
Decommissioning, Lifting Operations, Rigging
Equipment
Crane, Lifting Accessories, Process Pipework and Pipelines, Winch, Wire Rope
Control
Exclusion Zones, Lifting Plan
Sector
Upstream Oil and Gas
Setting
Offshore Installation, Vessel