Investigation Report

Pipeline Rupture Following Closure of Incoming Boarding Valve

BSEEBureau of Safety and Environmental Enforcement

12-05-2006 18:00 G01220 EI/158 Required Evacuation - LTA > 3 days - Fire

Read at BSEEOpens the document on bsee.gov

Summary

Investigation of a pipeline rupture at MP 69 Echo following closure of an incoming boarding valve at MP 69 Delta. Pinned-open safety-valve relays prevented the E-1 well from shutting in, causing pipeline overpressure. The report examines safety-panel logic, piping failure analysis and damage to platform equipment and structure.

Topics

About This Record
Original title
12-05-2006 18:00 G01220 EI/158 Required Evacuation - LTA > 3 days - Fire
Publisher
Bureau of Safety and Environmental Enforcement
Type
Investigation Report
Date
Unknown
Topic
Explosion, Functional Safety, Hydrocarbon Release, Pressure Systems
Equipment
Process Pipework and Pipelines, Valve
Sector
Upstream Oil and Gas
Setting
Offshore Installation
Link
Checked , working
Record
bsee-9674efe01b · added 2 October 2026

Report a problem with this record