Investigation Report
Hydrogen Sulphide Release Through Corroded Piping During Pigging
Read at BSEEOpens the document on bsee.gov
Summary
BSEE investigates a hydrogen sulphide release during pigging at Main Pass 299-FP. Exterior corrosion compromised scrubber outlet piping; inadequate routine corrosion maintenance was identified as the primary cause. The report describes repeated alarms, mustering, breathing apparatus use and leak detection. Internal corrosion was not confirmed.