Investigation Report
Platform Blackout During Uninterruptible Power Supply Replacement
Read at BSEEOpens the document on bsee.gov
Summary
Investigation of a Thunder Horse platform blackout during uninterruptible power supply replacement. It examines inverter failure, power synchronisation tolerances and a persistent abandon-platform signal, alongside battery-room gas readings and evacuation. Recommendations address black-start procedures, protective features, engineering handover, blackout evacuation arrangements and critical ventilation performance.