Summary

Investigation of a workstring ejection during tubing cutting at VR 398 Well A002. Sand and wireline debris obstructed the DX plug’s equalising ports, while a leaking overshot packoff gave a false indication of pressure equalisation. Blowout preventer closure controlled the well; the report records equipment damage and recommends a safety alert.

Topics

About This Record
Original title
08-01-2012 00:20 G09529 VR/398 Structural Damage/Required Muster
Publisher
Bureau of Safety and Environmental Enforcement
Type
Investigation Report
Date
Unknown
Topic
Corrosion, Pressure Systems, Well Control
Activity
Pressure Testing, Well Intervention
Equipment
Blowout Preventer, Wellhead
Control
Well-Barrier Testing
Sector
Upstream Oil and Gas