Investigation Report

Hydrocarbon Spray During Well Equalisation Header Removal

BSEEBureau of Safety and Environmental Enforcement

05-10-2023 0933 G16661 MC 941 A Required muster

Read at BSEEOpens the document on bsee.gov

Summary

BSEE examines a hydrocarbon spray during removal of a well equalisation header on the Titan spar platform. Residual fluid and trapped pressure in a dog-leg were overlooked despite isolation. Gas detection prompted muster; neither worker was injured. The report describes protective equipment, medical assessment and planned reviews of residual-pressure hazards.

Topics

About This Record
Original title
05-10-2023 0933 G16661 MC 941 A Required muster
Publisher
Bureau of Safety and Environmental Enforcement
Type
Investigation Report
Date
Unknown
Topic
Hydrocarbon Release, Pressure Systems
Activity
Inspection and Maintenance
Equipment
Personal Protective Equipment, Process Pipework and Pipelines
Control
Emergency Response, Energy and Process Isolation
Sector
Upstream Oil and Gas
Setting
Offshore Installation
Link
Checked , working
Record
bsee-11617625c5 · added 2 October 2026

Report a problem with this record