Investigation Report
Completion Brine Discharged Overboard During Well Completion
Read at BSEEOpens the document on bsee.gov
Summary
An MMS investigation examines the loss of approximately 70 barrels of completion brine into the Gulf of Mexico during well completion operations. A leaking butterfly valve admitted fluid to a pre-load tank with open valves. Recommendations address installation pressure and function testing, additional valve isolation and lockout/tagout.