IMCA: High Potential Near Miss: Diving bell main lift wire connection failure
- Publisher
- Step Change in Safety · Step Change in Safety
- Type
- Safety Alert
- Date
- Themes
- Crane and RiggingDivingLifting OperationsStructural and Asset Integrity
Themes: crane and rigging, diving, lifting operations, structural and asset integrity.
Login required at publisher. Step Change in Safety restricts this document to members or registered users. The link below goes to the publisher’s own page.
Open at Step Change in SafetyResources are free for members of member companies; you will need to log in at Step Change to open them. Links go to the resource page, never to the download itself.
© Step Change in Safety, all rights reserved; this site links to the Step Change resource pages and hosts no publisher download files.
Publisher link checked · working