Skip to content
IMCASafety Flash

Pipe stacking incident

Publisher
IMCA · International Marine Contractors Association
Type
Safety Flash
Reference
IMCA SF 05/04
Date
Themes
Dropped ObjectsManagement of ChangeStructural and Asset Integrity

Summary

A pipe stack slumped after smooth coating increased chock forces, showing the need to reassess storage methods when conditions differ.

Summary written automatically from the title and document text.

IMCA SF 05/04. Themes: dropped objects, management of change, structural and asset integrity.

Open at IMCA

Safety flashes are public web pages on imca-int.com; the PDF is a rendering of the page. Guidance documents such as M203 need IMCA access to open the native file.

© IMCA, all rights reserved; this site links to IMCA's own pages and hosts no publisher download files.

Publisher link checked · working

Related documents